(STRUCTURAL INTEGRITY & ITS SAFETY THREAT/MAGNITUDE)

Risk Assessment Approach

  1. Questionnaire: A list of questionnaire were used to collect the data
  2. Assessment: Life Cycle, Maintenance, Controls and redesign of tower.
  3. Vulnerability Sources: The team accessed the several vulnerability sources to identify.
  4. Site Visit: The team consists highly experienced Engineers/Professors conducted a site visit to collect the data.
    1. Risk Model
    2. Threat Likelihood
    3. Magnitude of ImpactThreat impact in design.
  5. Checking Of Design & Integrity (GSM & MW ANTENNAE AT GIVEN KMPH WIND SPEED) Design Impact Assessment
  6. Proposal for Health Checking with Check List

MORE RISK ASSESSMENT STUDY SURVEY