DGPS+ CITY MAP
- Establishment of DGPS control point.
- Level transferring from nearest SOI’s GTS Bench Mark to Take off Point and at an average of 5 Km along the pipeline route
- Establishment of TP’s by using DGPS.
- Topographical survey of 50M either side of the proposed center line.
- Providing survey data through Arc GIS System as per agreed interval
- Survey of power distribution & transmission network as per specification
- Dwelling Density Survey as per ASME 31.8/OISD 226 and preparation of report
- Preparation of Alignment Sheets (1:5000)
- Locating and preparation of report for underground utilities.
- Preparation of Cross-section drawings
- Road / Railway Crossings
- Water Bodies Crossings
- Foreign Pipeline Crossing
- Preparation of Route Map (1:50000).
- Preparation of Detailed Route Survey report.